Integrated Drilling and Production System
One Integrated Unit
The Integrated Drilling and Production System (IDPS) is fully assembled and tested onshore, and pre installed on well location prior to rig arrivial, and is designed to allow the full well construction program to be executed through the system.
Installation and retrieval
The IDPS is installed and retrieved by vessel and ROV. No rig will be required.
IDPS Module
The IDPS Module includes the compact flange and production system main body as well as the integrated isolation valves. The module is pre installed as part of the fully assembled and tested unit. Internally, the body is prepared for casing and tubing hangers, with a horizontal production outlet.
Compact Flange
The Compact Flange is a high strength connection which connects the HPWHH and the CWSDA, with design and specifications from NST in cooperation with TP Connectors.
Compact Well Stress Distribution Adaptor
The Compact Well Stress Distrubution Adapter (CWSDA) is delivered by NST and is machinened from one forging and will be welded to the structural components of the suction anchor (CAN by Neodrill).
Well Construction Adaptor Subs
Applicable arrangements of well construction adapter subs will be installed below the CWSDA to facilitate cementing evacuation and the applicable well construction program.
Suction Anchor (CAN)
The CAN suction anchor will be delivered by Neodrill as per standard specifications.
Well Construction material
Applicable well construction material such as casing hangers, seal assemblies and running tools will be supplied by the SPS supplier.
Integrated - Simplified - Designed - Engineered - Manufactured - Assembled - Delivered by