Integrated Drilling System
The IDS represent an integration and simplification of conventional well construction elements, enabling the system to be pre-assembled and tested onshore, and pre-installed on location by vessel prior to rig arrival.
Emphasis has been made to allow usage of conventional drilling and well construction material and services for the remaining well construction activity.

Low pressure housing
Standard. Welded to conductor.
Conductor
Standard. Jetted or cemented in place.
Wellhead
Standard. Welded to surface casing.
Surface casing
Standard. Drilled and cemented in place.
Cementing
Standard. Required for well foundation integrity.
Drilling tools
Standard.
Well construction material
Standard

Low pressure housing
Omitted and replaced by IDS.
Conductor
Omitted and replaced by IDS. CWSDA and CAN transfer all loads to formation
Wellhead
Standard wellhead design. Integrated and pre installed with IDS. Non welded Compact flange connection.
Surface casing
Omitted and replaced by IDS. Alternative 18"/ 17" or 16" surface casing.
Cementing
Omitted and replaced by IDS. Not required for well foundation integrity.
Drilling tools
Standard.
Well construction material
Standard. No large tubulars (>18") required.
Integrated - Simplified - Designed - Engineered - Manufactured - Assembled - Delivered by